CENTER FOR ADVANCED STUDIES OF MINING PROJECTS
(CESPROMIN)
|
|
|
|
Mines ParisTech - Site de Fontainebleau
1st October - 30th June
Alternating language sessions French / English
French language program - Optional French lectures between July and September
CANDIDATE PROFILE
Engineers, geologists and managers working in or
for the mining industry.
TEACHING PROGRAM - French sessions : 2012 ; 2014 - English sessions : 2011 ; 2013
Module
1 : Mining techniques (3 weeks)
Mining methods / Rock mechanics / Blasting / Rock cutting
Mineral and waste processing
Module 2 : Evaluation methods of mineral reserves (1 weeks)
Traditional methods / Linear geostatistics / Difficulties in assessing mineral reserves
Module
3 : Managing the economy of a
mining company (3 weeks)
Mining in France / General economy / Discounted cash-flow calculations
Revenues and expenditures of mining companies
Mining project feasibility and assessment of risk
Module 4 : Mine planning (1 week)
Long term planning / Short term planning
Module 5 : The
environment of Mining operations (2 weeks)
Raw materials market / Mining law / Environmental studies
Case studies of mining properties and mining projects
Mining and sustainable development
Module
6 : Computer assisted exploration
workshop CLAIM (4 weeks)
From
initial exploration to mining projects pre-selection
Module
7 : Technical study of a mining
project : courses and practical exercises (2 weeks)
Mine infrastructure / Selection of mining methods
Selection of mining equipment
Investment, manpower and operating costs
Module 8 : Financing and
implementation of mining projects (2 weeks)
Taxation, financing mining projects
External growth : example of industrial minerals
Construction of a mine and a processing plant
Module
9 : Economic study of a mining
project : courses and practical exercises (3 weeks)
Economic assessment of mining projects / Sensitivity analysis and risk evaluation
Visits to mines and to manufacturers of mining
equipment (3 x 1 week)
Individual project (12 weeks)
DIPLOMA
Successful students are awarded a national French diploma in specialized training conferred by Mines ParisTech and the Ministry in charge of mines.
LIFE CONDITIONS
In order to get informations on life costs and
conditions, please get in touch with the Supervisor.
You can find other informations on the web site CNOUS.
DELAYS FOR ENROLMENT
In order to get your enrolment in time, we
insist that you consider the following critical parameters :
- Study of your candidature file and decision : 2 to 3 months
- Visa formalities : up to 3 months
- Financing your stay : variable (you have to ask imperatively)
COMPLEMENTARY INFORMATIONS
École
Nationale Supérieure des Mines de Paris web site
TYPICAL INDIVIDUAL PROJECTS AT CESPROMIN
• SONG Hong, Chine 1999
Prefeasibility study of the Dong Guashan copper deposit
• MARIN HERRERA Benito Ricardo, Mexique 1999
Techno-économic evaluation of the backfilling system of the lead and zinc Naica mine.
• PETTER Renato Aurélio, Brésil 2000
Stratégie d’expansion et d’investissement en exploration dans la mine d’or de Cerro Vanguardia en Argentine
• SHAHAR EFFENDI Bin Abdullah Azizi, Malaisie 2001
The Reevaluation of the Feasibility Study of the Labuk Copper Project
• JAXYBAYEV Aiderkhan, Kazakhstan 2001
Transition from Prefeasibilty to Feasibility Study of the Muyunkum Uranium Project
• COULIBALI Aïssé (Mme), Mali 2002
Evaluation technique et économique du gisement d’or de LOULO au Mali
• SAHASRABUDHIE Mohan, Inde 2003
Prefeasibilty study for underground mining at Bangur Chromite mine
• SUJATMIKO Jatmiko, Indonesie 2003
Evaluation of the tailings dam closure planning at PTK Equatorial Mining in East Kalimantan
• KASSI Jean Pierre, Côte d’Ivoire 2004
Evaluation technique et économique de l’exploitation à ciel ouvert du gisement d’or de Bonikro
• ALDABBAGH Mohammed, Arabie Saoudite 2005
Prefeasibilit study of a dolomite mine in Ara’ar
• NANEZ AGUDELO José Julian, Colombie 2005
Economic evaluation of coal deposits in CAUCA area
• AL GAMDI Ameen, Arabie Saoudite 2006
Update feasibility study report of Az Zabirah bauxite mine
• ANTON PRIATNA, Indonésie 2007
Study of ore haulage system at Mill Level Zone and Deep Mill Level Zone of he block cave mine of Cupper and gold in Ertsberg District
• AGHOMA Armelle, Gabon 2007
Evaluation économique de la rentabilité du projet mine plus matériel roulant. Cas du gisement de fer de Belinga Secteur Babiel
• VIANA BRANDI Iuri, Brésil 2008
Prefeasibility project. An underground Iron Ore mine in South cast of Brazil
• OMGBA AHANDA Lin Christophe, Cameroun 2008
Resource and economic evaluation of Mada Cobalt-Nickel Lateritic deposit in South East of Cameroon
.
See also the bulletin des travaux de fin d'études.
CONTACTS
You may get in touch with
the former CESMAT students through the directory.
Supervisor : Mrs Isabelle THENEVIN
Secretary : Mrs Sandrine MOTTE
Maris ParisTech - École des Mines de Paris
Centre de Géosciences - CESPROMIN
35, rue Saint Honoré
77305 FONTAINEBLEAU Cedex (France)
Tél. : +33 1 64 69 49 04 - Fax : +33 1 64 69 47 11
E.mail : resp_cespromin@geosciences.ensmp.fr
Web site : http://www.geosciences.mines-paristech.fr
|
|
|
|